Chinese High-speed Railway Tie Plate: CHR-2R

Short Description:

SKU: CHR-2R
The steel grade is supposed to be required by client needs.


Product Detail

Product Tags

The showing price is excluded shipment and tax, and estimated based on the steel grade in the diverse standards of different countries as below: International (ISO): Fe360B USA (AISI, ASTM, UNS): Gr.C Japan (JIS): SS330; STKM12A China (GB): A3; Q235 Germany (DIN, WNr): 1.0028; 1.0036; St34-2; USt37-2 France (AFNOR): A34-2S; 235JRG1 England (BS): CEW2BK; Fe360B Russia (GOST): 16D; 18kp; St3kp Italy (UNI): Fe330; Fe360BFU Spain (UNE): AE235B-FU Sweden (SS): 1312 Poland (PN): St3SX Czechia (CSN): 11343; 11373 Austria (ONORM): St34RG; St37F; USt360B Norway (NS): NS12-122 PRODUCT INFO
Material Type Sample Product Weight Material Weight
Meet product physical performance requirements 19.5 kg 21.5 kg
PRICE INFO
(a)Material Cost (b)Production Cost (c)Packaging Cost (d)Delivery Cost (a~d)Unit Price
Depend on the steel grade USD $12.1/pc USD $0.4/pc Depend on the country and location USD $12.5/pc + (a+d)
Mould Fee
USD $6,380
Note: The Quotation above is updated on Nov 2021, and only for reference purposes. Please contact us for getting the latest Price, due to different weights in diverse product designs, timely changes in material cost and currency exchange rate, etc. The (a~d) Unit Price without Tax. If the product orders over 30,000 pieces, the Mould Fee will be returned after the contract is formally signed. TECHNICAL SPECIFICATION For Concept Design & Mould Simulation: All dimensions including R angles can be appropriately adjusted according to technical requirements. The size of the tolerance can be adjusted according to the client needs. For Production: The product physical performance and surface treatment meet the technical requirements of the drawings. The product must have NO burrs, NO crack, NO pits and NO other defects that affect product use. PAYMENT AND SHIPPING INFO The client shall pay the Price by means of an irrevocable Letter of Credit (hereinafter referred to as "L/C") at sight in a specific currency in favor of Huaguang Seiko within 10 working days after signing of a purchase Agreement, L/C covering 100% shall be established through a specific bank which can be required by the client. 100% amount of the Goods shall be paid by L/C at the timing of each shipment against presentation of the specific documents to the negotiation bank. In addition, Huaguang Seiko shall send to the client the copy of those specific documents within 1 working date after the date of the bill of lading.

  • Previous:
  • Next: